Advisory-first · vendor-neutral

Smart choices for every solar problem.

New install, maintenance or a system that just isn't performing — get honest advice, subsidy help and trusted registered vendors near you.

Happy family on a rooftop with solar panels under a smiling sun

About SOLVOLT

We're on your side of the table.

Vendor-neutral

No commissions shape our advice. We recommend what fits your roof, bill and budget.

Advisory-first

Understand options, subsidy and payback before anyone sells you anything.

Registered vendors

We connect you to vendors listed on the PM Surya Ghar national portal.

Services

Whatever your solar situation, start here.

Solar installation guide

The basics, minus the jargon.

Rooftop vs ground-mount

Rooftop uses existing space and suits most homes. Ground-mount fits farms and factories with open land and allows ideal tilt.

On-grid, off-grid, hybrid

On-grid exports surplus via net metering (cheapest, no backup). Off-grid relies on batteries. Hybrid gives both grid export and backup.

Sizing: kW vs your bill

1 kW makes ~120 units/month. A ₹3,000 bill (~430 units) needs roughly 3–4 kW and ~300–400 sq ft of shadow-free roof.

Net metering

A bi-directional meter credits units you export. Your DISCOM approves it after installation and inspection.

Payback period

With subsidy, residential systems typically pay back in 3–6 years and last 25+ years.

Panel types

Mono PERC and TOPCon are efficient and common; bifacial gains extra on reflective surfaces. DCR panels are required for subsidy.

Inverters & batteries

String inverters suit most homes; microinverters help with shading. Lithium batteries last longer than lead-acid but cost more.

PM Surya Ghar: Muft Bijli Yojana

Up to 300 free units a month for households.

Eligibility

  • Indian citizen owning a house with a suitable roof
  • Valid electricity connection in the applicant's name
  • Not availed any other solar subsidy for rooftop solar

How to apply

  1. Register on the national portal with state, DISCOM and consumer number
  2. Log in and apply for rooftop solar
  3. Get feasibility approval from your DISCOM
  4. Install via a registered vendor for your DISCOM
  5. Submit plant details and apply for net meter
  6. After commissioning, submit bank details — subsidy is credited to your account

Documents needed

Aadhaar, latest electricity bill, bank account details (cancelled cheque/passbook), property ownership proof, and rooftop photo.

Subsidy structure (residential)

Indicative — verify on the official portal
System sizeCentral assistance
1 kW₹30,000
2 kW₹60,000
3 kW and above₹78,000 (max)

Some states add top-up subsidies. Group housing societies have separate per-kW rates.

Visit pmsuryaghar.gov.in

Solar savings calculator

What could solar save you?

Assumes ~₹7/unit, ~120 units per kW per month and ~100 sq ft per kW. Actual numbers vary by DISCOM tariff in Karnataka, orientation and shading.

Estimate

Suggested system

3.5 kW

Est. subsidy*

₹78,000

Monthly savings

₹2,940

Payback

~3.7 yrs

*Indicative residential PM Surya Ghar assistance. Verify on the official portal.

Testimonials

Happy (and sunny) customers.

“They told me I needed 3 kW, not the 5 kW a vendor pushed. Saved a lot!”
Ananya, Bengaluru
“My inverter fault was fixed in two days after months of runaround.”
Rahul, Pune
“Subsidy paperwork felt impossible. SOLVOLT made it simple.”
Fatima, Hyderabad

Sample testimonials for illustration.

FAQ

Questions, answered.

Contact

Let's figure out your solar.

+91 90000 00000

Mon–Sat, 9am–8pm

hello@solvolt.in

We reply within a day

Fastest: chat with Sunny